6. Pegboard

Use a Chalk Line to make level, horizontal lines on the installation wall at the following points:

For all cabinets except the workbench, mark a level line at 72" from the floor for the rail, and a line at 82" (10" higher) as a leveling line for the tops of the cabinets.

For a workbench, mark a level line at 25-1/2" from the floor for the rail and at 35-1/2 (10" higher).

PDF Download these instructions to print or read offline

Illustration Instructions Comments

Using a stud finder locate and mark the studs between the upper cabinets and the workbench. Put the 3" tech screws in the rail for the above cabinets can also be used as a location indicator.

Center the pegboard between the upper cabinets and the workbench from left to right, top to bottom.

Use 3" deck screws to secure the pegboard to the marked studs. Run the screws through the pegboard next to the frame. Be sure to catch the 1" support rail on the back side of the pegboard panel.

When putting the pegboard on the end of a run of cabinets, run the screws into all 4 corners of the pegboard.

Designed by: Interworks, Inc.